You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Crossing Saluran di Kampung Nelayan Rampung 2 Pekan

Crossing Channel Built in Kampung Nelayan Kamal Muara

The North Jakarta Water Resources (SDA) Sub-agency has built a crossing channel in Kampung Nelayan RT 02/04, Kamal Muara Urban Village, Penjaringan Sub-district.

The work is targeted to be completed in two weeks

Its channel was built to connect the channels from a residential area to the main channel that led to Kamal Muara Pump to overcome inundation during heavy rains.

Penjaringan Sub-district SDA Unit Head, Pendi conveyed, during heavy rains, the residential area was often inundated because the channel was not connected to the main channel. Residents had asked his side to deal with inundation in the area through Musrenbang 2021.

Four Sheet Piles Repair in Cipinang Elok will Be Completed Next Week

"Since Wednesday (3/2), we have been starting the construction work by deploying 6 personnel," he mentioned, Friday (3/4).

His side planned to build a crossing channel with a length of 230 centimeters, width of 50 centimeters, and height of 50 centimeters.

"The work is targeted to be completed in two weeks," he said.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1203 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye996 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye954 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye731 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye631 personAnita Karyati